AIPROENERGY blog
Texas based manufacturing of mining pods
Setting up rack for (216) S19 / (240) M30s in a 20ft BitTank. The structure is ready. The fans are evenly distributed across a long wall of a high cube box assuring a uniform heat removal
Working on the filtering wall and
power panel.
More information on our
Twitter page
.
2021-09-05 13:36